Nhấn VÀO ĐÂY để chuyển bài viết sang bản tin tiếng Việt
After identifying the project, in order to have an implementation plan through dividing work parts, progress and other requirements to prepare for posting and bidding notices, the step to create a Selection Plan is to create a selection plan. Contractor and posting are necessary intermediate steps that must be taken.
To be able to manage the Notice of Invitation to Bid, the system allows you to access the management page in one of three ways:
Method 1: From the menu Bid Soclicitors => Contractor Selection Plan management (See Picture 1.1)
: From Project Management section > Add contractor selection plan function button (See Picture 1.2)
After choosing to initiate the Contractor Selection Plan, the system will display the declaration form, then there will be two different cases including the case of having a project and the case of not having a project.
Case 1: In the case of a previously declared and publicized project, in the Project section, select the correct project that has been created, then the system automatically retrieves the declared project information, at declaration step The system contractor selection plan only requires declaring information as shown in Picture 2.1
The information that needs to be declared is as follows:
Information field | Describe |
Plan name | This is a mandatory declaration, the declaration name can be set by the user as appropriate |
Date of approval | Select approval date if applicable |
Plan description | Write a description |
Decision number | Declare if any |
Attached files | Upload file if there are attached information files |
: In case there is no previously declared project, the system allows additional project declaration with two options:
Information field | Describe |
Bidding package name | The bidding package name set by the user is consistent with the bidding package intended to invite bids |
Field of contractor selection |
Choose 1 of the 39 areas that we have divided ►Note: the contractor selection field allows you to select more than 1 field at a time. Choosing the correct field will help the system find and screen better contractors for the bidding package |
Step 1: In the Functions area -> select the Edit button.
For contractor selection plans that are in Draft status, they can be permanently deleted from the system. For contractor selection plans that have been posted publicly, the plan can only be canceled.
To delete or cancel, use the Delete function button (for draft posts) or cancel (for public posts in the Function area. When canceling, the system will ask to declare the Cancel reason (see Picture 3.2).
Author: Linh Hồ Thị
Newer articles
Older articles
If you do not have a member account, please register.You can use your account at DauThau. info to login on DauThau. Net and vice versa!
This takes only 5 minutes and is completely free! Your account can be used in all our systems, including DauThau.info and DauThau.Net